Tiles on the walls must be laid correctly and all operations should be performed extremely neatly and accurately. After all, the slightest flaws on the wall trimmed with tiles will be clearly visible. Before laying the tiles, the walls need to be cleaned of the old coating, chattering, aligning all irregularities and wash it with soap solution. To prevent the formation on the wall of mold and enhance the adhesion of the adhesive and wall, it must be primed. While the primer will dry out, you need to prepare the required amount of tile for each horizontal row. It is also necessary to prepare cutting tiles of the required size. This is necessary for the case if whole tiles are not placed in a row. Cutting is best done with a tile cutter. But you can use glass cutter. First, on the back of the tile, you need a pencil line, then draw along the line with a tile. Having laid the tiles on the edge of the table along the cutting line, you need to sharply break it. By the way, construction tours are very popular now, they are used in the construction of houses.
On wooden rails, fixed in opposite angles of the wall, you need to attach strictly horizontally twig. Horizontal can be checked by level. Before applying glue to the tile, it must be moistened with water. Glue should be applied not only to tiles, but also on the wall (it is better for its small area). Putting the tile to the wall, you need to crush it slightly. By installing the dividing crosses, you can glue the following tiles. All subsequent tiles can be laid similarly. The dividing crosses are removed at the end of the work, you do not need to wait complete the glue to dry. Когда клей полностью высохнет, швы нужно заделать затиркой нужного цвета. And excess grouts are removed by a rag.