How to repair the floor screed: Stages

February 1, 2019
SHARE

The repair of the floor screed should begin with the detection of defects on the basis that it is planned to be repaired. To prevent the passage of exfolved sections of the floor, it is necessary to tap its entire area, if when you hit the surface you hear a dull sound, this indicates the detachment of the screed section. Such areas must be cut out. After finding all the exfolved areas, they must be covered with a special mixture. In the case of the destruction of the old screed with a volume of more than 30%, its full replacement will be the best solution.

After we knocked out all the cracks and cavities in the old screed, we should proceed to grinding the base, which is necessary to remove the remaining surface layer of concrete. During and after the work of grinding, a layer of dust forms on the surface of concrete, which after the end of the work must be removed. Now you should wait 24 hours, and only then continue repair work.

In the event that your decision was the complete reconstruction of the floor screed, you first need to prepare a mixture for filling the floor in compliance with the proportion. Then this mixture must be poured along the floor, throughout its perimeter, if you have a large room, then you need to divide it into sites and pour it in parts. When breaking the floor, not segments, the mixture is poured into them separately, as a result, a formed single space is obtained. The repair of the floor screed is completed by grouting the base.

If you have completed the floor screed with high quality, it will be the key to the longevity of your gender.

In the production of a new floor screed, strict adherence to special requirements and norms is necessary, if you are not observed, in your screed, destruction and cracks may soon appear.

After a couple of days, after all the work on the screed is completed, you can walk on the floor, but its complete drying is about 45 days, why you should not rush and put the low floor loads.

The next article on the topic “Paul repair” is the repair of wooden floors

You Might Also Like

Online car sales: what you need to know and recommendations

Online car check by VIN code: what to pay attention to?

Online services for checking cars by VIN number: how to choose

How to maintain heat inside the building: what to do

Do I need to insulate the brick wall: Stages

drivingnewsusa February 1, 2019 February 1, 2019
Share This Article
Facebook Twitter Email Print
Previous Article Wall repair: sequence of actions
Next Article How to make high -quality and durable repair

Latest

Online car sales: what you need to know and recommendations
February 26, 2025
Online car check by VIN code: what to pay attention to?
February 26, 2025
Online services for checking cars by VIN number: how to choose
February 26, 2025
Mercedes-Benz chief designer admits big screens aren’t cool, but they’re here to stay
February 26, 2025
Toyota Land Cruiser FJ gets a new debut date
February 26, 2025

Popular

Reinforcement for the foundation: what to pay attention to when choosing
March 27, 2018
Autonomous heating: how to choose a suitable option
March 27, 2018
Auto on credit: is it worth it to issue what to take into account
March 28, 2018
How to improve the balcony with your own hands: Features
March 29, 2018
How to decorate with your own hands a balcony: Methods
March 30, 2018
© Driving New USA - the most beautiful cars, 2017-2024. All Right Reserved.
Welcome Back!

Sign in to your account

Lost your password?