After you have already flooded the foundation, and it has survived a certain period of time (about 21-30 days – the minimum period), you will need to build the walls of your house. To begin with, you should decide from which material, they will be, and what thickness, and then proceed to decisive action.
You need water for the construction of walls, which can need a lot; cement, which should be not lower than the M400 brand; career sand; Brick for cladding, but this is only if you decide to do a lining; The most important thing is blocks or bricks from which the walls of your home will be. In order not to interfere with the solution manually, it is better to find and use a concrete mixer. So you will spend much less effort, time and energy.
In order to build the walls correctly, it is necessary to do this gradually, giving the layers to dry a little and contact. Each row of bricks or blocks must be laid in turn, constantly checking a special level of wall slope. This is done so that the walls of the house are not littered in different directions. If you have already laid out several rows, then you should not immediately load the following on them. Give the design time a little stronger. It is better to carry out such actions the next day.