Formwork is a peculiar forming temporary aid for the construction of solid structures (foundation) of the building, which guarantees it the greatest strength, and most importantly, the main and undeniable quality is durability. When erecting formwork, you should pay attention to such an important issue of the sound insulation of the ceiling.
The formwork is divided into two categories, namely:
– Removable – when the preliminary structure after the hardening of concrete (foundation) is removed with unnecessary
– non -removable – is part of the concrete itself (foundation)
Consider the process of building formwork itself.
For the base, it is necessary to nail on driven wooden bars with nails, from the inner surface of the formwork, plywood (or boards). So that such a design is as strong as possible, you can fix with a distance of one meter in addition to the outside with a distance. After all these events, we proceed to fill the foundation (concrete).
It must be remembered that starting to make the formwork, check for the evenness of the surfaces (using the construction level), both the horizontal and vertical plane of the foundation. Since with the wrong calculation and incorrect (braid) lining of formwork, problems can arise in the future with the construction of even walls of the house.